Plant Hire –Choose
All Plant Hire items are available on daily or weekly rates, and are subject to availability – please contact us for terms or further information. If you do not see what you need please ask – we may have it! Read or download our full Plant Hire List in .pdf format.
(Acrobat® Reader required, if not installed available free from www.adobe.com) |
Investigation, Surveying and Monitoring
|
|
|
Ground water monitoring to check dewatering draw-down levels using an audible level indicator. |
Measurement for the monitoring of lateral movement between Traverse Line Stations. |
Dewatering: flow testing of an ejector well. |
Accurate information relating to ground conditions and the behaviour
of unstable structures or sub soils is
fundamental to the identification and
analysis of ground instability. |
Ground Stabilisation Ltd. offers a complete range of the measures necessary to identify the causes and prevention of instability and structural movements by co-ordination of:
- Site-specific investigative plans;
- Ground investigation: rotary coring and cable percussion; boring/in-situ testing and sampling;
- Conventional surveying techniques;
- Geotechnical instrumentation and monitoring including standpipe, piezometer, inclinometer and extensometer.
- Inspection, Load testing & monitoring of ground anchors and condition surveys. More>>
|
|
|